Location

Fairmount Heights, MD

Project Details

Aaron Enterprises, Inc. was contracted to install 146’ of 54” steel casing by pipe ramming. The casing was installed in two pushes from the same launch pit. The casing was advanced under a stream using a 24” pipe rammer. Spoils were removed using an auger boring machine and 36” steel water main was pushed into place and bulkheaded.

Final Product

54” x 0.750 WT Steel Casing, 36” Steel Water Main Carrier

Geology

Boulders, Weathered Rock

Completion Date

October 2021

Installation Methods

  • Pipe Ramming

Markets Served

Sewer and Water

Category: Pipe Ramming Projects, Project ProfilesTag: Sewer and Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.