• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

CTDOT MNRR Bridge Replacement

Download Complete Project Profile

Location

Stamford, CT

Project Details

Installation of 392 LF of 42” casing to house relocated electric duct banks. Three crossing in hard rock under Long Island Railroad. Stabilized the crown of the bores to minimize potential settlement. Installed conduit duct bank inside 42” sleeves and grouted.

Final Product

Electric Cable System

Geology

Granite rock/boulders overlayed by sand and gravels

Completion Date

December 2016

Installation Methods

  • Auger Boring
  • Pipe Jacking and Tunneling
  • Soil Stabilization
  • Grouting

Markets Served

Heavy Civil Construction

Transportation

Railway

Electric

Category: Auger Boring Projects, Project ProfilesTag: Electric Projects, Heavy Civil Construction Projects, Railway Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.