Wyandanch Sewer Extension

Download Complete Project Profile

Location

Suffolk County, NY

Project Details

Installation of two crossings utilizing guided pilot boring. First crossing was 290 LF in length @ .18% slope consisting of a 36” steel casing with a 20” DR-18 carrier pipe. Second crossing was 228 LF in length @ .12% consisting of a 30” steel casing with an 18” DR-18 carrier pipe. Carrier pipes were installed within the steel sleeves on AEI’s custom fabricated rail system. Once carrier pipes were installed the annular area then was filled with grout.

Final Product

Sanitary Sewer System

Geology

Sand

Completion Date

April 2016

Installation Methods

  • MicroTunneling – Guided Pilot Boring
  • Grouting

Markets Served

Sewer and Water

Category: MicroTunneling-Pilot Tube Method Projects, Project ProfilesTag: Sewer and Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.