Vulcan Materials Quarry

Download Complete Project Profile

Location

Stafford, VA

Project Details

Aaron Enterprises, Inc. was contracted to complete a design build emergency repair of an 800’ section of 72” corrugated metal storm water culvert. Erosion caused the hillside above the pipe to give way leaving an 85’ cliff and 800’ of pipe collapsed. Aaron Enterprises, Inc. proposed hand tunneling a 66” steel casing into place and slip lining it with 63” HDPE to complete the repair. The 72” corrugated metal pipe was intersected by the 78” casing with no alignment issues. The 63” HDPE was then pulled into place in one continuous section.

Final Product

78” steel casing, 63” HDPE carrier pipe

Geology

Sand, boulders, unconsolidated ground

Completion Date

April 2011

Installation Methods

  • Pipe Jacking and Tunneling
  • Pipe Rehabilitation
  • Engineering Services

Markets Served

Heavy Civil Construction

Storm Water

Communication, Commercial and Building

Category: Engineering Services Projects, Project ProfilesTag: Communication Commercial and Building Projects, Heavy Civil Construction Projects, Storm Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.