UGI 29th St. Bridge Relocate Gas Main

Download Complete Project Profile

Location

Harrisburg, PA

Project Details

The UGI 29th St. Bridge Relocate gas main project consisted of one bore with 24″ Steel casing. The bore totaled 354 LF and crossed underneath Norfolk Southern Railroads and I-83 North & Southbound lanes. A 16″ gas main carrier was installed inside the 24″ steel casing. The relocation of the UGI gas main is part of the I-83 Expansion Project. Throughout the first 60′ of the bore, Aaron Enterprises’ crew encountered obstructions, boulders and limestone pinnacles during the guided pilot phase. When unable to advance further, a 36″ steel casing was installed and hand tunneled through to remove the obstructions on a 24/7 basis. Approximately 124′ of 36″ casing was installed. The 24″ steel casing was then inserted through the 36″ casing and was bored to the exit pit. 

Final Product

16″ Gas Main

Geology

Clay, Fill, Boulders, Rock

Completion Date

April 2024

Installation Methods

  • Auger Boring
  • Pipe Jacking and Tunneling

Markets Served

Heavy Civil Construction

Oil and Gas

Category: Auger Boring ProjectsTag: Heavy Civil Construction Projects, Oil and Gas Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.