PTC Mainline Toll Facility

Download Complete Project Profile

Location

Bensalem, PA

Project Details

A box culvert jacking required directional drilling for soil stabilization, pilot tube microtunneling for guide casing installation, and tunnel methods for box culvert installation. Auger boring methods were used to install steel casings for RCP crossings. A 1:3 grout was used for filling voids outside of the box culvert and as annular fill between the casings and their corresponding carrier pipes.

Final Product

136 LF of 8’x7’ Box Culvert, 167 LF of 18” RCP, 83 LF of 24” RCP, 73 LF of 36” RCP

Geology

Gravely Sand, some silt and clay

Completion Date

March 2014

Installation Methods

  • Auger Boring
  • Horizontal Directional Drilling
  • Pipe Jacking and Tunneling
  • MicroTunneling (Pilot Tube Method)
  • Soil Stabilization
  • Grouting

Markets Served

Storm Water

Heavy Civil Construction

Transportation

Category: Project Profiles, Soil Stabilization ProjectsTag: Heavy Civil Construction Projects, Storm Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.