Location
Bensalem, PA
Project Details
A box culvert installation under the Pennsylvania Turnpike required directional drilling for soil stabilization, pilot tube microtunneling for guide casing installation, and tunnel methods for box culvert installation. Auger boring methods were used to install steel casings for RCP crossings. A 1:3 grout was used for filling voids outside of the box culvert and as annular fill between the casings and their corresponding carrier pipes.
Final Product
167 LF of 18″ RCP ,83 LF of 24″ RCP, 73 LF of 36″ RCP, Installation of 8′ x 7′ Concrete Box Culvert
Geology
Clay, Sands, Silts
Completion Date
March 2014
Installation Methods
- Auger Boring
- Horizontal Directional Drilling
- Pipe Jacking and Tunneling
- MicroTunneling
- Soil Stabilization
- Grouting
Markets Served

Storm Water

Heavy Civil Construction