• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

Principio North Interceptor

Download Complete Project Profile

Location

Perryville, MD

Project Details

Furnishing and installation of 384 LF of 36″ diameter steel casing by guided pilot auger boring. Footage split between two crossings, one under I-95 and one under CSX Rails. The crossings were 130 LF and 254 LF respectively. Prior to casing installation on the CSX crossing, AEI stabilized the soils along the bore path. The final product pipe installed was 8″ Ductile Iron Pipe for gravity sewer.

Final Product

Installation of 384 LF of 36″ via Guided Pilot Boring. 8″ Ductile Iron Inside 36″ Steel Casing

Geology

Soils

Completion Date

January 2017

Installation Methods

  • Auger Boring
  • Soil Stabilization
  • Grouting

Markets Served

Sewer and Water

Category: Auger Boring Projects, Grouting Projects, Soil Stabilization ProjectsTag: Sewer and Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.