Location
Perryville, MD
Project Details
Furnishing and installation of 384 LF of 36″ diameter steel casing by guided pilot auger boring. Footage split between two crossings, one under I-95 and one under CSX Rails. The crossings were 130 LF and 254 LF respectively. Prior to casing installation on the CSX crossing, AEI stabilized the soils along the bore path. The final product pipe installed was 8″ Ductile Iron Pipe for gravity sewer.
Final Product
Installation of 384 LF of 36″ via Guided Pilot Boring. 8″ Ductile Iron Inside 36″ Steel Casing
Geology
Soils
Completion Date
January 2017
Installation Methods
- Auger Boring
- Soil Stabilization
- Grouting