Location
Drexel Hill, PA
Project Details
A gas replacement project in the middle of Springfield Borough required a roadway shutdown along Saxer Ave. AEI excavated rock to install the launch and exit pits. Working on a narrow roadway, between multiple utilities, the crew used a pneumatic hammer to bore under Septa Rails, installing 180 LF of 12″ diameter steel casing. An 8″ steel gas line was then installed through the 12″ casing. After the cathodic protection measures were installed, the crew backfilled the excavations and restored the area to its original conditions.
Final Product
180 LF of 12″ Steel Casing for 8″ Steel Gas Pipe
Geology
Rock
Completion Date
August 2022
Installation Methods
- Auger Boring