PECO Springfield and Burmont

Download Complete Project Profile

Location

Drexel Hill, PA

Project Details

A gas replacement project in the middle of Springfield Borough required a roadway shutdown along Saxer Ave. AEI excavated rock to install the launch and exit pits. Working on a narrow roadway, between multiple utilities, the crew used a pneumatic hammer to bore under Septa Rails, installing 180 LF of 12″ diameter steel casing. An 8″ steel gas line was then installed through the 12″ casing. After the cathodic protection measures were installed, the crew backfilled the excavations and restored the area to its original conditions.

Final Product

180 LF of 12″ Steel Casing for 8″ Steel Gas Pipe

Geology

Rock

Completion Date

August 2022

Installation Methods

  • Auger Boring

Markets Served

Oil and Gas

Category: Auger Boring ProjectsTag: Oil and Gas Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.