• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our History
    • Our Mission
    • Safety
    • Our Facility
    • World’s Greatest TV
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

Licking River 36″ Crossing

Download Complete Project Profile

Location

Covington, KY

Project Details

Aaron Enterprises successfully installed 1,281 linear feet (LF) of 36″ DR 11 DIPS HDPE pipe beneath the Licking River using horizontal directional drilling (HDD). Drilling was performed through challenging subsurface conditions consisting of alternating layers of shale and limestone, and the borehole was reamed to 50 inches to accommodate pullback of the pipe. In addition to the crossing, AEI’s scope included pipe fusion and hydrostatic testing of the 36″ HDPE pipeline.

Final Product

36″ HDPE Water Main

Geology

Rock

Completion Date

May 2023

Installation Methods

  • Horizontal Directional Drilling

Markets Served

Sewer and Water

Category: Horizontal Directional Drilling ProjectsTag: Sewer and Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Copyright © 2009–2026 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.