• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

Duke Energy Central Corridor

Download Complete Project Profile

Location

Cincinnati, OH

Project Details

Aaron Enterprises, Inc. was contracted to complete a variety of challenging trenchless crossings on a high-profile Duke Energy project in Cincinnati. In total, AEI completed 2,300 LF of 20” installs by auger bore, pipe ramming, guided pilot (360 LF) and air hammer on 17 crossings. AEI excavated all pits ranging from 10’ to 28’ deep in tight work areas on city streets. Soil stabilization was required at high water table locations. In addition, AEI completed 4,550 LF of 20” install by HDD on three crossings ranging from 1,600 LF to 1,450 LF.

Final Product

20” Steel Gas Main

Geology

Glacial till, interbedded shale/siltstone, sandstone

Completion Date

October 2021

Installation Methods

  • Auger Boring
  • Horizontal Directional Drilling
  • Pipe Ramming
  • MicroTunneling
  • Soil Stabilization

Markets Served

Oil and Gas

Category: Pipe Ramming Projects, Project ProfilesTag: Oil and Gas Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.