Location
Cincinnati, OH
Project Details
Aaron Enterprises, Inc. was contracted to complete a variety of challenging trenchless crossings on a high-profile Duke Energy project in Cincinnati. In total, AEI completed 2,800 LF of 20” installs by auger bore, pipe ramming, guided pilot (360 LF) and air hammer on 17 crossings. AEI excavated all pits ranging from 10’ to 28’ deep in tight work areas on city streets. Soil stabilization was required at high water table locations. In addition, AEI completed 4,550 LF of 20” install by HDD on three crossings ranging from 1,450 LF to 1,600 LF.
Final Product
20” Steel Gas Main- 4500 LF of 20″ by HDD, 2800 LF of 20″ Steel by Auger Bore
Geology
Sands, Silts, Rock
Completion Date
October 2021
Installation Methods
- Auger Boring
- Horizontal Directional Drilling
- Pipe Ramming
- MicroTunneling
- Soil Stabilization
Markets Served