Location
College Park, MD
Project Details
Constructed Game Day Tunnel connecting Cole Fieldhouse locker rooms to Byrd Stadium. The 16.3’ diameter liner plate tunnel required pretreatment of soils before tunneling. Installed a series of horizontal grout pipes and injected grout in soil strata prior to tunneling. Installed 185LF of liner plate tunnel, a waterproof membrane and shotcrete the circumference along with a finished concrete floor.
Final Product
Waterproof Pedestrian Access Tunnel
Geology
Sands, Silts, Clay
Completion Date
December 2018
Installation Methods
- Hand Tunneling
- Soil Stabilization
- Tunnel Waterproofing
Markets Served
