• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

Cole Field House Game Day Tunnel

Download Complete Project Profile

Location

College Park, MD

Project Details

Constructed Game Day Tunnel connecting Cole Fieldhouse locker rooms to Byrd Stadium. The 16.3’ diameter liner plate tunnel required pretreatment of soils before tunneling. Installed a series of horizontal grout pipes and injected grout in soil strata prior to tunneling. Installed 185LF of liner plate tunnel, a waterproof membrane and shotcrete the circumference along with a finished concrete floor.

Final Product

Waterproof Pedestrian Access Tunnel

Geology

Sands, Silts, Clay

Completion Date

December 2018

Installation Methods

  • Hand Tunneling
  • Soil Stabilization
  • Tunnel Waterproofing

Markets Served

Heavy Civil Construction

Category: Pipe Jacking and Tunneling Projects, Soil Stabilization ProjectsTag: Heavy Civil Construction Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.