Amtrak Culvert Replacements

Download Complete Project Profile

Location

Glen Dale, MD

Project Details

After well points were unable to properly dewater a perched water table, the auger bore method of pipe installation resulted in sinkhole development and a shutdown to Amtrak’s NE corridor rail lines. The face of the bore was secured, and a horizontal stabilization program was implemented by Aaron Enterprises, Inc. to improve the soils. With the soils improved, the work crew used hand tunnel methods and the jacking system of the bore machine to install the steel casing. The product pipe was installed through the 72” casing and the annular space filled with cellular grout.

Final Product

135 LF of 48” RCP in a 72” Diameter Steel Casing Pipe

Geology

Running/flowing sand, silt, and clay

Completion Date

February 2021

Installation Methods

  • Auger Boring
  • Pipe Jacking and Tunneling
  • Soil Stabilization
  • Grouting

Markets Served

Storm Water

Heavy Civil Construction

Transportation

Railway

Category: Project Profiles, Soil Stabilization ProjectsTag: Heavy Civil Construction Projects, Railway Projects, Storm Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.