Location
Philadelphia, PA
Project Details
Aaron Enterprises was contracted to perform three horizontal directional drills (HDDs) at the historic Navy Yard in Philadelphia. The scope of work included the successful installation of 3,032 linear feet of eight (8) 6-inch HDPE conduits.
To ensure containment of drilling fluids and maintain ground stability, each HDD entry point was reinforced with 42-inch conductor casing and treated using soil grouting techniques. This approach minimized environmental impact and ensured precise bore path control throughout the project.
Final Product
(8) 6″ HDPE Bundle
Geology
Sands, Silts, Fill
Completion Date
August 2025
Installation Methods
- Horizontal Directional Drilling
- Pipe Ramming
- Soil Stabilization
- Grouting
- Engineering Services