• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

ECMS 10046

Download Complete Project Profile

Location

St. Thomas, PA

Project Details

Aaron Enterprises, Inc. was contracted to install 72” of RCP under US Route 30 in St. Thomas PA. Geology in the area consisted of gravel and sand and needed to be stabilized prior to Tunnel Boring. An Akkerman TBM was used to install the RCP.  Minimal back grouting was needed due to the pretreatment of the soils.

Final Product

130 LF of 72” Reinforced Concrete Pipe

Geology

Loose gravel, sand and silt

Completion Date

June 2021

Installation Methods

  • Tunnel Boring
  • Soil Stabilization
  • Grouting

Markets Served

Heavy Civil Construction

Transportation

Storm Water

Category: Grouting Projects, Pipe Jacking and Tunneling Projects, Soil Stabilization Projects, UncategorizedTag: Heavy Civil Construction Projects, Storm Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.