Jacob’s Creek

Download Complete Project Profile

Location

Delaware River, PA

Project Details

Aaron Enterprises, Inc. was contracted to install 3,500 LF of 14” steel gas main by HDD on a project in central and eastern Pennsylvania. AEI’s scope consisted of 2 HDD’s and 1 auger bore, the project is part of upgrade work on a 14” line that crosses the state. Two high profile HDDs were completed on this project. A 2600 LF install under the Delaware River in 34,000 PSI meta-shale requiring 160 LF of 36” conductor casing and sound walls. A second 900 LF install of 14” was completed under I-81 in quartzite and coal seams.

Final Product

3500 LF of 14” Steel Gas Main

Geology

34,000 PSI meta-shale, quartzite and coal seams

Completion Date

January 2023

Installation Methods

  • Horizontal Directional Drilling
  • Auger Boring

Markets Served

Oil and Gas

Category: Horizontal Directional Drilling Projects, Project Profiles, UncategorizedTag: Oil and Gas Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.