Location
San Antonio, TX
Project Details
Aaron Enterprises, Inc. was contracted to complete four auger bores in San Antonio, TX to relocate a 16″ gas main for an upcoming highway project. A total of 450 LF of boring was completed, with individual bores ranging from 80 to 175 feet. The pipe was installed in hard limestone with known karst features using a 16″ hammer. Voids were encountered during drilling, requiring grouting of the annular space to meet highway specifications. The project was executed on a 24/7 schedule due to necessary closures of highway on/off ramps.
Final Product
16” Steel Gas Main
Geology
Karst Limestone
Completion Date
February 2022
Installation Methods
- Auger Boring
- Grouting
Markets Served

Oil and Gas