Blacks Run Interceptor

Download Complete Project Profile

Location

Harrisonburg, VA

Project Details

196 Liner Feet of 72” x 1.00” steel casing with 48” carrier pipe @ 1.02% grade installed via Tunnel Boring Machine. Aaron Enterprises, Inc. used an Akkerman mixed face TBM to install this line and grade critical gravity sewer crossing. Two AEI crews worked 24 hours 7 days per week while averaging 10’ of casing installation per day. The crossing was extremely difficult due to the mixed ground conditions; however, Aaron Enterprises, Inc. crews did an excellent job to hit the “bullseye” on this one!

Final Product

Gravity Sewer

Geology

Solid limestone (20,000 psi) to pinnacles of limestone transitioning to dirt.

Completion Date

December 2020

Installation Methods

  • Pipe Jacking and Tunneling

Markets Served

Sewer and Water

Category: Pipe Jacking and Tunneling Projects, Project ProfilesTag: Sewer and Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.