• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Aaron Enterprises, Inc.

Aaron Enterprises, Inc.

Trenchless Technology Experts - Aaron Enterprises, Inc.

  • Who We Are
    • About Us
    • Our Mission
    • Safety
    • Our Facility
  • Services
  • Markets Served
  • Projects
  • Contact
  • (717) 854-2641

NEBT 4th Street

Download Complete Project Profile

Location

Washington, DC

Project Details

A short crossing under 4th St. in Washington DC was needed to tie an inlet into the larger Anacostia River Project while keeping the roadway open to one way traffic. Soil borings suggested the presence of flowing ground. The work crew pumped permeation grout above the crown of the proposed crossing to solidify the soil prior to jacking a 60” diameter steel casing under the roadway.

Final Product

15 LF of 60” Steel Casing

Geology

Loose and running gravel, sand and silt

Completion Date

December 2020

Installation Methods

  • Pipe Jacking and Tunneling
  • Soil Stabilization
  • Grouting

Markets Served

Storm Water

Heavy Civil Construction

Transportation

Category: Pipe Jacking and Tunneling Projects, Project ProfilesTag: Heavy Civil Construction Projects, Storm Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.