Bristol, PA

Project Details

A roadway reconstruction project north of Philadelphia included two jacked pipe crossings under Interstate 95. The design called for implementation of a soil improvement program. Aaron Enterprises, Inc. injected chemical grout vertically around the perimeter of the jacking pits and horizontally along the path of the proposed crossings prior to installation of the RCP. An Akkerman Tunnel Boring Machine was used to jack the concrete pipe into place. After installation, the crew back grouted the pipes to assure no voids were left around the pipe perimeter.

Final Product

207 LF of 72” RCP and 172 LF of 54” RCP for Storm Water Management

Geology

Wet, gravely sand

Completion Date

May 2019

Installation Methods

  • Tunnel Boring
  • Soil Stabilization
  • Pipe Jacking & Tunneling
  • Grouting

Markets Served

Storm Water

Transportation

Heavy Civil Construction

Category: Pipe Jacking and Tunneling Projects, Project ProfilesTag: Heavy Civil Construction Projects, Storm Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.