North George Manchester Sewer

Download Complete Project Profile

Location

York, PA

Project Details

Three crossings under Interstate 83, Lightner Rd. and Toronita St. were needed to install a 30” trunk sewer line to a city sewer plant. The three crossings required the use of a 54” diameter tunnel boring machine (TBM) with a rock/mixed face. A conventional boring machine in the launch pits provided the jacking thrust as well as the torque for an auger driven spoil tube muck removal system. Over 800 LF of 54” diameter steel casing was installed for this project.

Final Product

30” Ductile Iron Pipe for Sanitary Sewer

Geology

Mixed fill with Boulders

Completion Date

May 2019

Installation Methods

  • Tunnel Boring
  • Grouting

Markets Served

Sewer and Water

Transportation

Heavy Civil Construction

Category: Pipe Jacking and Tunneling Projects, Project ProfilesTag: Heavy Civil Construction Projects, Sewer and Water Projects, Transportation Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2025 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.