6300 Philadelphia Pike

Download Complete Project Profile

Location

Claymont, DE

Project Details

Project involved the rehabilitation of an existing concrete archway and sluice box that drained into The Delaware River. Concrete debris created an unstable condition under existing Conrail Tracks. Work crew placed track supports, stabilized the track ballast with cellular grout, removed the mass concrete and installed The DuroMaxx liner pipe, bends and grates under a strict timeline.

Final Product

120 LF Contech DuroMaxx Liner Pipe

Geology

Dredge Fill, Loose Debris, Mass Concrete

Completion Date

October 2021

Installation Methods

  • Pipe Rehabilitation
  • Pipe Jacking and Tunneling
  • Grouting

Markets Served

Storm Water

Heavy Civil Construction

Railway

Category: Pipe Rehabilitation Projects, Project ProfilesTag: Heavy Civil Construction Projects, Railway Projects, Storm Water Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.