20 MW Capacity Enhancement – Phase 1 and 2

Download Complete Project Profile

Location

Philadelphia Navy Yard, PA

Project Details

Aaron Enterprises, Inc. was contracted to complete a design build HDD across a channel at the Navy Yard in Philadelphia. The crossing length was 1100 LF to install a 16” HDPE bundle. HDD design completed by AEI can be found below. 36” conductor casing and chemical grouting was employed due to contaminated ground on rig side. AEI was contracted two years later to complete the second phase which consisted of an additional 3300 LF of 24” HDPE bundle install on three separate crossings by HDD.

Final Product

Phase 1: (4) 6” HDPE bundle, Phase 2: (8) 6” HDPE bundle

Geology

Low blow count sand

Completion Date

  • Phase 1 – February 2019
  • Phase 2 – October 2021

Installation Methods

  • Horizontal Directional Drilling
  • Pipe Ramming
  • Soil Stabilization
  • Grouting
  • Engineering Services

Markets Served

Electric

Category: Engineering Services Projects, Project ProfilesTag: Electric Projects

Innovation. Teamwork. Technology.

“Whatever It Takes” Since 1976

Contact us
  • Services
  • Markets Served
  • Projects
  • Employment
  • Who We Are
  • Contact
  • Link to Aaron Enterprises, Inc. YouTube page
  • Link to Aaron Enterprises, Inc. LinkedIn page
  • Link to Aaron Enterprises, Inc. Facebook page

(717) 854-2641


Gold Shovel Standard logo

Copyright © 2009–2023 · Aaron Enterprises, Inc. · All Rights Reserved · Powered by BizBudding Inc.